Create an Upgrade Work Order when Replacing Equipment
Use this standard workflow when existing physical HVAC or refrigeration equipment is being permanently replaced or upgraded.
💡 Key Requirement: Always close or resolve all open repair tickets and work orders associated with the old unit before initiating an upgrade order.
Create an Upgrade Work Order when Replacing Equipment
Execute the following steps when existing equipment is scheduled for replacement.

If an equipment is replaced by a technician without completing an Upgrade Work Order, Monaire will not reflect the correct asset details.
1
Open the Equipment Being Replaced
Buildings > Select Building > Select Specific Equipment
Navigate to Buildings in your Monaire app, select the building, and select the specific equipment that is slated for replacement.
2
Review and Close Existing Repair Work Orders
Navigate to the equipment's Work Orders tab. Use Filters to identify all non-completed work orders and take one of the following actions on these work orders:
- Cancel: The repair is no longer required due to the pending replacement.
- Cancel Follow-Up: The follow-up repair is no longer required because the equipment is getting replaced instead.
- Complete: If the technician completed the repair but did not properly Complete the work order.
⚠️ Before the equipment is replaced: Resolve any outstanding work orders for the equipment before proceeding with the Upgrade work order.
3
Issue the Upgrade Work Order
Select 'Start Work Order,' then choose 'Upgrade.' The equipment details will automatically populate — confirm the information matches the unit being replaced.
3.1 Enter Amount and Due Date
If applicable, enter the NTE (not-to-exceed) budget amount in 'Do not exceed amount (Optional).' Set the 'Due by' date far enough out to allow sufficient lead time for procurement and installation; full equipment replacements typically require extended completion windows.
3.2 Assign Contractor
Under the Contractor section, verify the mechanical contractor selected for this replacement or select Change to assign the appropriate one.
3.3 Finalize Creation
Review the details, then select Create.
✓
Expected Result: Upgrading Status
Upon creation, the equipment state automatically transitions to Upgrading. This indicates that an Upgrade work order is officially active in the system and needs to be completed.