Onboarding (4/6): AC / Split Unit Install
Transcript
- All split units should be onboarded in the Monaire App as Air Conditioners (not RTUs). This is important because the checklist is different for packaged units versus split units.
- Just as is done when onboarding an RTU, you will select Add Equipment, then Air Conditioner, and type in the equipment name. For example, "AC 4."
- Then click the small arrow on the right of the equipment, to begin the installation checklist.
- As you can see, when onboarding an air conditioner, there are steps to add the Indoor and Outdoor unit information. This is to capture the details of both the air handler and the condenser. Complete these fields referencing information from the name plates.
- When adding the sticker of the Monaire tag, remember that the same tag number should be applied to both the indoor and the outdoor unit. Your hardware kit includes 3 stickers per equipment.
- Look for a spot on the supply and return ductwork within 1-2 feet of the air handler to mount your supply and return sensors. If there's an existing hole in the air handler to drop the probe of the temperature sensor, utilize this. Otherwise, drill a new hole.
- Once you’ve screwed the sensor to the ductwork, drop the probe into the hole, press the button on the sensor, and scan it into the Monaire app.
Related Articles
Onboarding (2/6): Gateway Install
Please reference this Youtube video Onboarding (2/6): Gateway Install Video Transcript As soon as you select Start Installation on the Install work order, you'll see a list of all the hardware at the location. The list should be empty and show (0) ...
Onboarding (5/6): Thermostat Install
Please reference this Youtube video Onboarding (5/6): Thermostat Install Transcript This video walks through how to complete the Thermostat Step on the installation checklist for RTUs, Split Units, and Unit Heaters. In the hardware box, you’ll find ...
Onboarding (3/6): RTU Install
Please reference this Youtube video Onboarding (3/6): RTU Install Video Transcript To begin the installation of an RTU, you’ll go to the main screen of the install work order and press the Add Equipment button in the top right corner. Select RTU and ...
Onboarding (6/6): Room Sensor Install
Please reference this Youtube video Onboarding (6/6): Room Sensor Install Transcript When adding a Red Link room sensor, start by putting the 2 AAA batteries in the sensor. Head to the thermostat screen, select Devices and Sensors and select Add. The ...
Onboarding (1/6): Accessing Install Work Order
Please reference this Youtube video Onboarding (1/6): Accessing Install Work Order Video Transcript To perform any work order at your customer’s location, you must use the Monaire Contractor App. This can be found in the App Store or the Google Play ...